THE PROJECT: FEATURES & COST
Morganza-to-the-Gulf Includes:- 72 miles of earthen levee with elevations from 9 feet to 15 feet
- 12 sector gate structures for flood control
- 12 environmental structures
- Lock complex on the Houma Navigational Canal

Proposed Morganza levee alignment

Location of proposed
Houma Navigational Canal Lock.
Estimated Project Cost:
| Total Federal Share: | $ 577 million |
| Total State/Local Share: | $ 311 million |
| Total | $ 888 million |