THE PROJECT: FEATURES & COST

Morganza-to-the-Gulf Includes:
  • 72 miles of earthen levee with elevations from 9 feet to 15 feet
  • 12 sector gate structures for flood control
  • 12 environmental structures
  • Lock complex on the Houma Navigational Canal
Proposed Morganza levee alignment
Proposed Morganza levee alignment

Location of proposed
Houma Navigational Canal Lock.

Estimated Project Cost:

Total Federal Share: $ 577 million
Total State/Local Share: $ 311 million
Total $ 888 million